The Brazilian port of Rio Grande has resumed operations with floating cranes. The 100-tonne Cábrea Acre floating crane was given a complete refurbishment to return it to its original condition at a cost of $2.2 million. It is now deployed in various parts of the port, handling large pieces of project cargo as well as large volumes of dry bulk, if required to do so.
BC