Cleveland Cascades are to supply our CC959 system to USA for loading Wood Pellets.
The system will be supplied with a pivoting head chute designed for use with a mobile ship loader with a luffing boom.
This is one of our 1350 sized systems and will be capable of loading up to 1450 cubic meters per hour. The chute will be 22.0 meters long from the interface flange to the base of the skirt outlet with a retracted height of 5.8m.
This system will be fitted with stainless steel lining in the head chute and UHMW PE lining in the GRP cones for abrasion resistance.
A full suite of electrical components will be supplied with the completed chute assembly for automated response to material detection and travel.
Source: Cleveland Cascades